How to finance building a house with a mortgage

Updated 10 October 2026 · 8 min read

A mortgage for building a house is paid out in stages as the build progresses, not in one sum. The bank values the finished house rather than what stands on the plot today, and calculates the 80 % LTV from that future value (90 % if at least one applicant is under 36). Until the loan is fully drawn, you pay only interest on the amount drawn, not the full annuity payment.

A typical case in October 2026: a house with a future value of CZK 6,000,000 on your own plot worth CZK 2,000,000, a construction budget of CZK 4,000,000 and a loan of CZK 4,000,000 at 5.00 % over 30 years. Over 18 months of building you pay roughly CZK 175,000 in interest, and after that CZK 21,473 a month. The drawdown deadline is usually 18–24 months. With the application, the bank wants the building permit, the project documentation, an itemised budget and a valuation.

How much will the bank lend to build a house?

The bank lends up to 80 % of the future value of the finished house, or 90 % if at least one applicant is under 36. That is the only binding ČNB (Czech National Bank) limit; the ČNB deactivated the DSTI and DTI ratios in 2023 and 2024, and banks now apply them as internal thresholds of their own. The future (collateral) value is what the valuer appraises: the house as it will stand when finished to the approved project.

A construction mortgage can cover the plot and the build together, or just the build on a plot you already own. The plot and everything built on it serve as collateral.

A plot you own counts towards your own funds (vlastní zdroje). That is where building differs from buying a flat: you do not necessarily need 20 % in cash, as long as the plot and your money together reach 20 % of the future value.

Two numbers have to agree: the itemised budget and the valuation of the future value. Build an expensive house where homes do not sell for that much and the valuer will mark the value down; LTV is then calculated from the smaller figure and you pay the difference. If the plot belongs to your parents, the bank will want it as collateral. Your parents become pledgors without having to be borrowers.

If you are buying a finished house, there is no build budget, no building permit and no staged drawdown. How a mortgage for buying a house works is covered separately.

Documents to prepare before you apply

A construction mortgage needs one more layer of paperwork than a purchase. The standard part stays the same: 2 identity documents, an income confirmation (potvrzení o příjmu) or 3–6 payslips, 1–2 tax returns if you are self-employed (OSVČ), and the title sheet from the land registry (list vlastnictví). On top of that comes the construction part:

Approval takes 2–4 weeks from complete documents. With a build, the usual hold-ups are an incomplete budget or a project that does not match the permit.

How does the bank pay out a construction mortgage?

The loan is released in tranches, usually 3–5, tied to stages: foundation slab, shell, roof and windows, services and plastering, completion. Banks work in one of two ways:

  1. Drawdown in arrears against documents. You pay the contractor's or supplier's invoices, submit them to the bank (often with a record of work done) and the bank reimburses you. It is safe for the bank, but you need the means to pre-finance each stage.
  2. Advance drawdown. The bank releases a tranche up front according to the budget and timetable, and after the stage asks for proof that the money went into the build: a visit by the valuer or the bank's technician, or sometimes just photos and an updated valuation. This is the usual mode for self-builds, where invoices do not cover your own labour.

The conditions for the first drawdown never change: the lien registered in the land registry (katastr nemovitostí), which the office may enter no sooner than 20 days after it notifies the owner of the pending change (plomba), for a fee of CZK 2,000; assigned building insurance; and proof of own funds. The bank wants to see your share go into the build first, and only then releases its own money. Each further drawdown takes a few days to process and may carry a fee, so check the fee schedule in advance.

You must draw the full loan within the period set in the contract, most often 18–24 months. Miss it and the bank either cancels the undrawn part or charges a non-drawdown fee and extends the period by an addendum. Sort it out before the deadline, not after.

Until full drawdown you pay interest only on what you have drawn. At a rate of 5.00 % that is CZK 4,167 a month per million: after the first tranche CZK 4,167, after the second CZK 8,333, after the third CZK 12,500, after the fourth CZK 16,667. The annuity, which starts paying off principal, begins only after full drawdown or when the drawdown period runs out.

Worked through for a house worth CZK 6,000,000, loan CZK 4,000,000, rate 5.00 %, term 30 years. You draw four tranches of CZK 1,000,000 in months 0, 5, 10 and 15, and occupancy approval comes in month 18. Interest during construction is 5 months × CZK 4,167 + 5 × CZK 8,333 + 5 × CZK 12,500 + 3 × CZK 16,667, roughly CZK 175,000. If you rent meanwhile for CZK 20,000 a month, housing costs you over CZK 36,000 a month at the peak of the build. From month 19 you pay an annuity of CZK 21,473 (over 25 years it would be CZK 23,384). Over 30 years the interest comes to about CZK 3.73 million, plus the CZK 175,000 from the construction period.

Draw only what each stage needs: every million drawn six months early costs CZK 25,000 in interest that adds nothing to the house. And agree with the bank that the annuity starts only after occupancy approval, because some contracts trigger it automatically when the drawdown period expires, whatever state the build is in. Compare term options with the payment calculation.

Self-build or a construction company?

Banks finance both, on different terms. It comes down to how easily the bank can check that the money ended up in the building.

Build with a contractor (turnkey)Self-build
Basis for the budgetworks contract with a fixed priceyour own itemised budget, assessed by the valuer
Drawdown modein arrears against invoices, sometimes in advance per timetablein advance, with a valuer's check after each stage
Own labournot recognisedsome banks recognise it as own funds, but the future value is reduced for it if documents are missing
Cost-overrun riskborne by the contractor (fixed price) or by you (budget with addenda)borne by you; the bank wants to see a reserve in the budget
Drawdown deadline18 months is usually enough24 months often needed, or an addendum
Banks' approachno restrictionssome banks apply a lower LTV or require the shell to be completed from own funds

The most common compromise is a contractor for the shell, roof and windows under a works contract, with the finishing done by you. The bank gets invoices for the largest tranches, and you save on work you can manage yourself.

From plot to occupancy approval

  1. Plot and project. If you are still buying the plot, you can finance it with a separate mortgage for land or with one mortgage for plot and build together. One mortgage is usually cheaper and simpler, but you need the project and permit before the money for the plot.
  2. Building permission. Under the new Building Act No. 283/2021 Coll., since 1 July 2024 this is a decision permitting the project (rozhodnutí o povolení záměru), issued in a single procedure that replaced the former separate zoning and building procedures. You apply for the mortgage once you have it; before that you can only get a pre-approval (předschválení) based on income.
  3. Application and approval: 2–4 weeks from complete documents, valuation of the future value included.
  4. Loan agreement, pledge agreement and the application to register the lien (CZK 2,000). The land registry may enter it no sooner than 20 days after it notifies the owner of the plomba.
  5. First drawdown once the conditions are met (lien, insurance, own funds invested).
  6. Further tranches, each after the previous stage has been documented.
  7. Full drawdown by month 18–24 at the latest, after which the annuity starts.
  8. Occupancy approval (kolaudace; under the new Building Act an occupancy decision, kolaudační rozhodnutí, rather than an occupancy consent) and registration of the building in the land registry. The bank sets a deadline for registering the house as a completed building, and afterwards usually updates the valuation and with it the LTV.

Mortgage-financed builds most often stall for one of four reasons. The first is a budget with no reserve: valuers and banks want one on top of the itemised costs, because material and labour prices move over two years of building. Second, changing the project without the bank's consent; a different house from the one valued means a new valuation and sometimes a new permit. Third, underestimating how long drawdown interest and rent overlap. Fourth, building on a plot whose owner refuses to pledge it.

If the budget grows during the build, increasing the existing mortgage by an addendum is usually cheaper than covering the shortfall with a consumer loan, provided the increase still fits within 80 % of the future value and your income.

How do you register a new house in the land registry?

The land registry enters a finished house on the owner's notification (ohlášení) under § 31 of the Cadastral Act (Act No. 256/2013 Coll.). With it you file the document that allows the building to be used, which for a house permitted under the new Building Act is the occupancy decision (kolaudační rozhodnutí), and a geometric plan (geometrický plán) drawn up by a surveyor (§ 30).

This is not a registration on application (vklad), so the CZK 2,000 fee charged for a vklad application does not apply; what you pay for is the geometric plan. Then send the bank a current title sheet (list vlastnictví) showing the house. Watch the deadline your loan agreement sets for this. Until the house is registered, many banks will not update the valuation, and the finished house is what raises the value of the collateral and lowers your LTV.

Sources

Terms in this article

Calculate your payment after full drawdown

Enter the construction loan amount, rate and term. The calculator shows the annuity payment and total interest, so you can compare 25 and 30 years side by side.

Work out the payment →

Frequently asked questions

How much of my own money do I need for a mortgage to build a house?

At least 20 % of the future value of the house including the plot, or 10 % if you are under 36. A plot you own counts as own funds, so with a plot worth CZK 2,000,000 and a house with a future value of CZK 6,000,000 you need no extra cash.

Can I finance the plot and the build with one mortgage?

You can, provided you already have the project and building permit when you apply. Without a permit, banks finance the plot with a separate plot mortgage and deal with the build later through a second loan or an increase.

When do I start paying the full mortgage payment?

Once the loan is fully drawn, or at the latest when the drawdown period (18–24 months) expires. Until then you pay only interest on the amount drawn, which at 5.00 % is CZK 4,167 a month per million.

What if construction costs rise and the budget is not enough?

Ask the bank to increase the mortgage by an addendum. It will go through if you stay within 80 % of the future value and your income allows it, which is why a reserve in the budget from the start beats covering overruns with a consumer loan.

Do Czech banks finance self-builds?

They do, but they release money in advance with a valuer's check after each stage and want a detailed itemised budget. Some require the first stage to be paid from your own funds, and only some recognise your own labour.